• About
  • Accreditations
  • Projects
  • Sectors
  • Team
  • News
  • Careers
  • Contact
Menu
  • About
  • Accreditations
  • Projects
  • Sectors
  • Team
  • News
  • Careers
  • Contact
  • About
  • Accreditations
  • Projects
  • Sectors
  • Team
  • News
  • Careers
  • Contact
Menu
  • About
  • Accreditations
  • Projects
  • Sectors
  • Team
  • News
  • Careers
  • Contact

Former Consett Steelworks – Reclamation

  • Home
  • Projects
  • Former Consett Steelworks – Reclamation
  • Project Genesis Limited / Barratt Developments
  • £3,950,000
  • Consett
  • 1 Year
010311-04
010311-10
010311-19
010311-41
Berry Edge site groundworks 01 November 2010
Berry Edge site groundworks 01 November 2010
Berry Edge site groundworks 01 November 2010
Berry Edge site groundworks 01 November 2010
011110-29
Berry Edge site groundworks 01 November 2010
Berry Edge site groundworks 01 November 2010
Berry Edge site groundworks 01 November 2010
Berry Edge site groundworks 01 November 2010
011110-43
020611-24
020611-27
020611-36
020611-47
020611-57
050411-20
050411-54
100611-10
100611-27
100611-28
100611-36
120411-09
120411-19
140111-03
140111-07
140111-09
140111-10
140111-11
140111-16
140111-20
270511-02
270511-06
270511-07
270511-12
270511-13
270511-16
270511-20
270511-21
270511-25
270511-32

Berry Edge, Former Consett Steelworks – Reclamation, Infrastructure and Plot Sub-structure works – Phase 1

Scope of works:
The ‘Berry Edge’ scheme involves reclamation and development of part of the Former Consett Steelworks Site for the construction of 321 houses and associated infrastructure.

Phase 1 of the scheme required the reclamation of 50% of the total site area, the second and final phase to be carried out at a future date.

Site investigation identified the presence of ‘hot spots’ of contamination and massive reinforced concrete foundations, which were the relic foundations of the former ‘billet mill’ on the steelworks. The works were carried out in accordance with a detailed remediation strategy, produced by Absolute Civil Engineering Ltd (ACE Ltd) & Shadbolt Environmental LLP which had been assessed and approved by the required regulators (ie: Durham County Council, Environment Agency).

The contract was procured on a ‘Design & Construct’ format whereby ACE Ltd employed the services of Shadbolt Consulting to carry out the infrastructure and plot foundation design to the requirements of Durham County Council and NHBC accordingly.

Made ground (primarily consisting of steel slag) and relic foundations were excavated to depths up to 5 metres. Underground service tunnels and foundations were broken out and excavated, and any hot spots of contamination were duly tested, treated or removed from site under controlled conditions to a licensed disposal facility.

Made ground on site had to be uplifted, screened, crushed and re-engineered to make up levels on the site. The ‘processed materials were re-deposited and underwent compaction to an ‘end-product’ specification.

A strict quality regime was adopted on site which included regular chemical (soils) analysis as well as in-situ and laboratory testing to ensure compliance with the parameters set out in the approved remediation strategy.

ACE Ltd engaged the services of a certified ‘Geo-environmental Engineer (Shadbolt Environmental LLP) who were resident on site to visually inspect the works, co-ordinate physical and chemical sampling and analysis and to give advice and instruction on environmental matters generally.

The reclamation scheme was immediately adjacent to an existing residential development so dust suppression and continuous environmental monitoring were essential. This also involved regular liaison with the council authority and local residents to keep them informed regarding the works.

As construction of the re-engineered platform progressed, a clay cover / capping layer some 600mm thick was imported and spread in accordance with the reclamation strategy.

Following completion of the Reclamation Phase, off site sewers up to 600mm diameter and 5 metres deep, as well as on site roads & sewers were constructed to facilitate the follow on housing development.

The scheme also involved the design and construction of the first phase (70 units) of housing and external works. This required the construction of reinforced ‘raft’ foundations across the site as well as associated services, public footpaths, driveways and external paving, gardens etc.

Absolute Civil Engineering Ltd were appointed as Principal Contractor to Project Genesis Ltd, with a phased ‘handover’ to Barratt Developments as sections of the site were completed.

Principal activities included:-

  • Excavation and re-engineering of circa 180,000 m3 of made ground and circa 20,000 m3 of relic foundations across the site to depths up to 5 metres.
  • Processing (Crushing / Screening) of materials to render acceptable for re-use as engineered fill.
  • Treatment and/or controlled disposal of ground contamination.
  • Intensive soils testing and analysis to detailed strategy / specification.
  • Construction of re-engineered platform for the purposes of housing & infrastructure development.
  • Production of ‘validation report’ upon partial and final completion of the works.
  • Construction of off-site sewers up to 675mm diameter (depths up to 5 metres).
  • Installation of circa 1,000 metres of storm water and foul water sewers on site to adoptable standards.
  • Construction of circa 3,500 square metres of estate roads to adoptable standards.
  • Design & Construction of phase 1 plot sub-structure – 70 plots (reinforced raft foundations), plot drainage, and external works (footpaths, services ducts, chambers, drives, gardens).

Get a copy of the project report here.

  • Environmental Policy Statement
  • Partnering/Supply Chain Policy
  • Quality Policy Statement
  • Health & Safety Policy Statement
  • Privacy Policy
Menu
  • Environmental Policy Statement
  • Partnering/Supply Chain Policy
  • Quality Policy Statement
  • Health & Safety Policy Statement
  • Privacy Policy

Mill House, Hownsgill Industrial Park, Consett, County Durham, DH8 7NU

Tel: 01207 201 210

We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”, you consent to the use of ALL the cookies.
Cookie settingsACCEPT
Manage consent

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may have an effect on your browsing experience.
Necessary
Always Enabled

Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.

Non-necessary

Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.