Absolute Civil Engineering Ltd were engaged by the Client to construct approximately 1300 m2 of new reinforced concrete hard standings as well as the foundations for a new overhead crane gantry for their steel fabrication facility.
The crane gantry construction was undertaken in 2009
Principal activities included:-
- Excavation and disposal of soils. Setting out and survey control
- Construction of new pad foundations and HD bolts for new crane gantry.
- Construction of reinforced concrete bays for new hard standings and lay down areas.
- Installation of new pits to existing factory for shot blasting equipment.